Journey to the new Shelter
- 1 Overview
- 2 Documentation
- 2.1 20220324 Fritz Landing 2
- 2.2 20220313 New Storage Container on Site
- 2.3 20220301 Preparing the Place for our new 12Meter Storage Container
- 2.4 20220221 New Road
- 2.5 20220220 Good Morning at SAWALAND
- 2.6 20220219 Road and Fence building
- 2.7 20220124 Snow is falling
- 2.8 20220107 Leveling the Ground Floor for the Dog Areas
- 2.9 20220104 A Man with a Plan
- 2.10 20211205-2 Placing the Poles for the Donkey Fence
- 2.11 20211205-2 Building the Sink Holes for the Sewage (second and third Level)
- 2.12 20211205-1 After the Storm and the rain in this Week
- 2.13 20211202 Farm Live Today
- 2.14 20211129-2 Second Stable finished
- 2.15 20211129-1 Dogs all over the Place
- 2.16 20211127-2 Farm Life Impressions
- 2.17 20211127-1 First Phase of Building the second Stable
- 2.18 20211125 Creating the Foundation for the second Staple
- 2.19 2021.11.21 Sawaland Tour
- 2.20 2021.11.10 Impressions from the Volunteer Level on Sawaland
- 2.21 2021.11.08 Building Fences on Sawaland
- 2.22 2021.11.06 When you know that this is HOME! Benjamin piglet laid back
- 2.23 2021.11.05-2 Sawaland Impressions
- 2.24 2021.11.05-1 Sawaland From Font to TOP
- 2.25 2021.11.04-3 Farm Live
- 2.26 2021.11.04-2 Pictures from the Volunteer Area (Building and Placing Container)
- 2.27 2021.11.04-1 SAWALAND from above
- 2.28 2021.10.31 Building the Base for the Living Containers
- 2.29 2021.10.12 Staple Completed
- 2.30 2021.10.09 Moving the first Goats to their new Home
- 2.31 2021.10.08 Building the First Staple for the Donkeys
- 2.32 2021.10.07 Preparing the fundamental for the Donkey Staples (till 22:00)
- 2.33 2021.10.05 Meeting with the major and Mr. Sigalas (Animal Office Santorini
- 2.34 2021.10.05 Building the House for the Goat’s Pigs and farm animals in general
- 2.35 2021.10.02 Building the First Toilette on Sawaland
- 2.36 2021.10.01 Signing the Pre-Sales Contract with the Owner
- 2.37 2021.09.23 More Terra forming
- 2.38 2021.09.22 Terra Forming the Land to suit our needs
- 2.39 2021.09.16 Put the Golden Shovel in the Ground
- 2.40 2021.09.15 Leveling the Ground
- 2.41 2021.09.08 Building the First Gates on Sawaland
- 2.42 2021.08.24 Life on Sawaland showing the Horse Area
- 2.43 2021.08.24 Moving the Horses to Sawaland
- 2.44 2021.08.18 First Water in the Water Tanks
- 2.45 2021.08.18 First Living Area in Sawaland (Tent)
- 2.46 2021.08.16 Water Tanks Installed
- 2.47 2021.08.13 Going further
- 2.48 2021.08.12 Fencing and Container at Level 0 Sawaland
- 2.49 2021.08.10 get it on
- 2.50 2021.08.08 First Impressions with Dave and Tig
- 2.51 2021.08.03 Building the Fences during the Heatwave
- 2.52 2021.07.31-3 First Terra forming on Sawaland
- 2.53 2021.08.04 Building the Road to the second Level
- 2.54 2021.07.31-2 First Steps on Sawaland
- 2.55 2021.07.31-1 Impressions from the Basecamp
- 2.56 2021.07.27 First Impressions from Sawaland
- 2.57 2021.05.19 Moving another Donkeys to the Basecamp
- 2.58 2021.05.18 Basecamp Impressions
- 2.59 2021.04.22 Walking with the first Animals to Basecamp
Overview
This page is used to document the journey to the new Shelter. Sorted by Dates (newest on the top). All pictures are taken from numerous Sources (Facebook, Messenger). The reason to do this is to collect all information's in one Page for later usage in News, Newsletters or Web Pages
Documentation
Here we go. please insert your pictures to the corresponding dates or add them with a new date
20220324 Fritz Landing 2
20220313 New Storage Container on Site
20220301 Preparing the Place for our new 12Meter Storage Container
20220221 New Road
20220220 Good Morning at SAWALAND
20220219 Road and Fence building
20220124 Snow is falling
20220107 Leveling the Ground Floor for the Dog Areas
Leveling the Entrance Floor with the Caterpillar
Floor Completed
20220104 A Man with a Plan
20211205-2 Placing the Poles for the Donkey Fence
20211205-2 Building the Sink Holes for the Sewage (second and third Level)
20211205-1 After the Storm and the rain in this Week
Road looks brilliant
20211202 Farm Live Today
20211129-2 Second Stable finished
20211129-1 Dogs all over the Place
20211127-2 Farm Life Impressions
20211127-1 First Phase of Building the second Stable
20211125 Creating the Foundation for the second Staple
2021.11.21 Sawaland Tour
2021.11.10 Impressions from the Volunteer Level on Sawaland
2021.11.08 Building Fences on Sawaland
2021.11.06 When you know that this is HOME! Benjamin piglet laid back
2021.11.05-2 Sawaland Impressions
2021.11.05-1 Sawaland From Font to TOP
2021.11.04-3 Farm Live
2021.11.04-2 Pictures from the Volunteer Area (Building and Placing Container)
2021.11.04-1 SAWALAND from above
2021.10.31 Building the Base for the Living Containers
2021.10.12 Staple Completed
2021.10.09 Moving the first Goats to their new Home
2021.10.08 Building the First Staple for the Donkeys
2021.10.07 Preparing the fundamental for the Donkey Staples (till 22:00)
2021.10.05 Meeting with the major and Mr. Sigalas (Animal Office Santorini
2021.10.05 Building the House for the Goat’s Pigs and farm animals in general
2021.10.02 Building the First Toilette on Sawaland
2021.10.01 Signing the Pre-Sales Contract with the Owner
2021.09.23 Unloading Supplies from https://fellnasen-santorini.de
They brought the following Materials
Hay for the Donkeys
2 Staples for the Donkeys
1 Storage Container
Pallets of food for the Dog’s and the donkeys
2021.09.23 More Terra forming
2021.09.22 Terra Forming the Land to suit our needs
During 5 Days Dave and some Construction People moving over 1000m3 Earth and Sand for creating the new Structure of the Land
Level 1 Entrance and Dog Areas and Horses (Including 2 Storage Container for Food, Tools and Utilities)
Level 2 Farm Animals Donkeys Stables (including 1 Storage Container for Food and Utilities)
Level 3 Volunteer Homes
Level 4 FriGas Home
Level 5 Top of Sawaland
2021.09.16 Put the Golden Shovel in the Ground
2021.09.15 Leveling the Ground
2021.09.08 Building the First Gates on Sawaland
2021.08.24 Life on Sawaland showing the Horse Area
2021.08.24 Moving the Horses to Sawaland
2021.08.18 First Water in the Water Tanks
2021.08.18 First Living Area in Sawaland (Tent)
2021.08.16 Water Tanks Installed
2021.08.13 Going further
2021.08.12 Fencing and Container at Level 0 Sawaland
The container has arrived at SAWALAND and the fencing nearly done for the donkey area. The doors need fiting and last bit of fence but that can't go up yet as Dave needs access with his mean machine so the military nets can be put up
2021.08.10 get it on
2021.08.08 First Impressions with Dave and Tig
2021.08.03 Building the Fences during the Heatwave
2021.07.31-3 First Terra forming on Sawaland
2021.08.04 Building the Road to the second Level
2021.07.31-2 First Steps on Sawaland
2021.07.31-1 Impressions from the Basecamp
2021.07.27 First Impressions from Sawaland
2021.05.19 Moving another Donkeys to the Basecamp
2021.05.18 Basecamp Impressions
2021.04.22 Walking with the first Animals to Basecamp