Journey to the new Shelter

 

Overview

This page is used to document the journey to the new Shelter. Sorted by Dates (newest on the top). All pictures are taken from numerous Sources (Facebook, Messenger). The reason to do this is to collect all information's in one Page for later usage in News, Newsletters or Web Pages

 

Documentation

Here we go. please insert your pictures to the corresponding dates or add them with a new date


20220324 Fritz Landing 2

 

 


20220313 New Storage Container on Site

 

 


20220301 Preparing the Place for our new 12Meter Storage Container

 

 

 

20220221 New Road

 

 

 

20220220 Good Morning at SAWALAND

 

 

 

 

 

20220219 Road and Fence building

 

 


20220124 Snow is falling

 

 

 

 


20220107 Leveling the Ground Floor for the Dog Areas

 

Leveling the Entrance Floor with the Caterpillar

 

Floor Completed

 


20220104 A Man with a Plan

 


20211205-2 Placing the Poles for the Donkey Fence

 

 


20211205-2 Building the Sink Holes for the Sewage (second and third Level)

 

 

 


20211205-1 After the Storm and the rain in this Week

Road looks brilliant

 

 


20211202 Farm Live Today

 

 


20211129-2 Second Stable finished

 

 


 

20211129-1 Dogs all over the Place

 

 

 

 


20211127-2 Farm Life Impressions

 

 

20211127-1 First Phase of Building the second Stable

 

 


 

20211125 Creating the Foundation for the second Staple

 


 

 

2021.11.21 Sawaland Tour

 


2021.11.10 Impressions from the Volunteer Level on Sawaland

 


2021.11.08 Building Fences on Sawaland


2021.11.06 When you know that this is HOME! Benjamin piglet laid back


2021.11.05-2 Sawaland Impressions

 

 

2021.11.05-1 Sawaland From Font to TOP

 

 


2021.11.04-3 Farm Live

 

 


2021.11.04-2 Pictures from the Volunteer Area (Building and Placing Container)

 


 

2021.11.04-1 SAWALAND from above

 

 


 

2021.10.31 Building the Base for the Living Containers

 

 


 

2021.10.12 Staple Completed

 

 

 


2021.10.09 Moving the first Goats to their new Home

 

 

 


2021.10.08 Building the First Staple for the Donkeys

 


2021.10.07 Preparing the fundamental for the Donkey Staples (till 22:00)

 


2021.10.05 Meeting with the major and Mr. Sigalas (Animal Office Santorini

 

 


2021.10.05 Building the House for the Goat’s Pigs and farm animals in general


2021.10.02 Building the First Toilette on Sawaland


2021.10.01 Signing the Pre-Sales Contract with the Owner


2021.09.23 Unloading Supplies from https://fellnasen-santorini.de

They brought the following Materials

  • Hay for the Donkeys

  • 2 Staples for the Donkeys

  • 1 Storage Container

  • Pallets of food for the Dog’s and the donkeys

 

 


2021.09.23 More Terra forming


2021.09.22 Terra Forming the Land to suit our needs

During 5 Days Dave and some Construction People moving over 1000m3 Earth and Sand for creating the new Structure of the Land

  • Level 1 Entrance and Dog Areas and Horses (Including 2 Storage Container for Food, Tools and Utilities)

  • Level 2 Farm Animals Donkeys Stables (including 1 Storage Container for Food and Utilities)

  • Level 3 Volunteer Homes

  • Level 4 FriGas Home

  • Level 5 Top of Sawaland


2021.09.16 Put the Golden Shovel in the Ground


2021.09.15 Leveling the Ground

 


2021.09.08 Building the First Gates on Sawaland


2021.08.24 Life on Sawaland showing the Horse Area


2021.08.24 Moving the Horses to Sawaland

 

 

 


2021.08.18 First Water in the Water Tanks

 


2021.08.18 First Living Area in Sawaland (Tent)

 


2021.08.16 Water Tanks Installed

 


 

 

2021.08.13 Going further

 

 


2021.08.12 Fencing and Container at Level 0 Sawaland

The container has arrived at SAWALAND and the fencing nearly done for the donkey area. The doors need fiting and last bit of fence but that can't go up yet as Dave needs access with his mean machine so the military nets can be put up

 


 

2021.08.10 get it on

 

 


2021.08.08 First Impressions with Dave and Tig


2021.08.03 Building the Fences during the Heatwave

 

 


2021.07.31-3 First Terra forming on Sawaland

 


2021.08.04 Building the Road to the second Level

 

 


2021.07.31-2 First Steps on Sawaland

 


2021.07.31-1 Impressions from the Basecamp

 

 


2021.07.27 First Impressions from Sawaland

 


2021.05.19 Moving another Donkeys to the Basecamp

 

 

 

 

 

 

 

 

 


2021.05.18 Basecamp Impressions

 


2021.04.22 Walking with the first Animals to Basecamp